Berth 8

Client: Built Environs

Service Provided: Provided formwork to support berth pours

Description: AIS developed a suspended modular beam and slab formwork system to construct the wharf deck for the Port Adelaide Wharf project. The design was tailored to the builders needs for speed, limited manpower, cranage, quantity, and high safety standards. The 230 metre long and 35 metre wide deck was built in 5 months with no lost time injuries.

The modular system is based around 6m longitudinal grid spacing and is available for hire.

AIS also provided full design support throughout the project.