Port River Bridge

Port River Road bridge Photo 2 Falsework supporting 55t Girders

Client: Abigroup

Service Provided: Falsework to support beams

Description:  AIS supplied a safe falsework system for both the Road & Rail Bridges to support the 55t tee roff beams, until the headstock was cast. We also provided additional steel column forms for the bridge columns and supplied formwork designs for the bascule section of the bridge.

In addition AIS were the construction engineers for the temporary enigneering for this project.